International Journal of Mining and Geo-Engineering

International Journal of Mining and Geo-Engineering

Author = Farhang Sereshki
Number of Articles: 5

Resilience estimation of the mining fleet (Case study: Sungun copper mine)

Volume 55, Issue 2, December 2021, Pages 151-156

10.22059/ijmge.2021.290468.594828

Adel Motahedi, Farhang Sereshki, Mohammad Ataei, Abbas Barabadi, Ali Nouri Qarahasanlou

Effect of maceral content on tendency of spontaneous coal combustion using the R70 method

Volume 54, Issue 2, December 2020, Pages 93-99

10.22059/ijmge.2019.269571.594766

Amir Saffari, Farhang Sereshki, Mohammad Ataei

Evaluation of Cutting Performance of Diamond Saw Machine Using Artificial Bee Colony (ABC) Algorithm

Volume 51, Issue 2, Autumn 2017, Pages 185-190

10.22059/ijmge.2017.232903.594672

Masoud Akhyani, Farhang Sereshki, Reza Mikaeil, Mohammad Taji

Fragmentation measurement using image processing

Volume 50, Issue 2, Autumn 2016, Pages 211-218

10.22059/ijmge.2016.59831

Farhang Sereshki, Morteza Hoseini, Mohammad Ataei

Numerical Modelling of the Segmental Lining of Underground Structures

Volume 48, Issue 2, Autumn 2014, Pages 147-157

10.22059/ijmge.2014.53100

Akbar Salemi, Fathang Sereshki, Morteza Esmaeili