[1] Whittaker, B. N., Frith, B. C. (1990). Tunneling −
design, stability and construction, The Institution
of Mining and Metallurgy, London, Ch. 14, pp.
331-350.
[2] Kasper, T., Edvardsen, C., Wittneben, G.,
Neumenn, D. (2008). Lining design for the district
heading tunnel in Copenhagen with steel fiber
reinforced concrete segments , Journal of
Tunneling and Underground Space Technology,
Elsevier, Vol. 23, pp. 574-587.
[3] Muir Wood, A.M. (1972). The circular tunnel in
elastic ground, Proc. Int. Symp. Underground
Openings, Lucerne, pp. 356- 369.
[4] I.T.A. Working Group No. 2 (2000). Guidelines for design of shield tunnel lining, International Tunneling Association, Journal of Tunneling and Underground Space Technology, Elsevier, Vol. 15, Issue 3, pp. 303-331.
[5] Huang, Z. R., Zhu, W., Liang, J. H., Lin, J., Jia, R. (2006). Three-dimensional numerical modeling of shield tunnel lining, Journal of Tunneling and Underground Space Technology, Elsevier, Vol. 21, pp. 434.
[6] Klappers, C., Grübl, F., Ostermeier, B. (2006). Structural analyses of segmental lining − coupled beam and spring analyses versus 3D-FEM calculations with shell elements, Journal of Tunneling and Underground Space Technology, Elsevier, Vol. 21, Issues 3-4, pp. 254-255.
[7] Mashimo, H., Ishimura, T. (2003). Evaluation of the load on shield tunnel lining in gravel, Journal of Tunneling and Underground Space Technology, Elsevier, Vol. 18, pp. 233-241.
[8] Lee, K. M., Ge, X. W. (2001). The equivalence of a jointed shield-driven tunnel lining to a continuous ring structure, Canadian Geotechnical Journal, Vol. 38 (3), pp. 461-483.
[9] Hefny, A. M., Tan, F. C., Macalevey, N. F. (2004). Numerical study on the behavior of jointed tunnel lining, Journal of The Institution of Eng., Singapore, Vol. 44 Issue 1 2004, pp. 108-118.
[10] NGO, (2002). The gazetteer of township in the I.R. of Iran-Tabriz township, National Geographical Organization Inc. Tehran, Iran, 209 p.
[11] World statesmen (2008), http://www.worldstatesmen.org/Iran.html.
[12] TURO, (2002). Geological report of Tabriz urban railway line 1, Tabriz Urban Railway Organization, Tabriz, Iran.
[13] Arthe Civil & Structure B.V. (2005). Determination of final geotechnical and geo (hydro) logical parameters for calculations, Report No.: ACS05203-R06-S03, 26 p.
[14] TURO, (2005). Final results of geological and geotechnical investigation on Tabriz urban railway line 1, Report for the Tabriz Urban Railway Organization, Tabriz, Iran.
[15] Itasca. (1999). FLAC, Fast Lagrangian Analysis of Continua, version 4.0.307, User’s manual, Itasca Consulting Group, Inc. Minneapolis, MN, http://itascacg.com.
[16] Arthe Civil & Structure B.V. (2006). Design and calculation of concrete segments, Report No.: ACS05203-R09-S04 & ACS05203-R09-S05, 57 p.
[17] U.S. Army corps of engineers (1997). Engineering and design of tunnels and shafts in rock, EM 1110-2-2901, Dep. of the U. S. Army, Washington, DC 20314-1000, 206 p.