[1]. Iranian Tunnelling Association (http://www.irta.ir)
[2]. International Tunnelling And Underground Space Association (http://www.ita-aites.org)
[3]. USA - UCA of SME - Underground Construction Association of SME (uca.smenet.org)
[4]. Guglielmetti , V., Grasso, P., Mahtab, , M., & Shulin, X. (2007). "Mechanized tunnellling in urban areas"., Turin, Italy: Taylor & Francis Group.
[5]. Langmaack, L. (2006). "EPB tunnelling – chances and limits. symposium on :Utilisation of underground space in urban areas"., Darmstadt, Germany: Sharm el-sheikh, Egypt.
[6]. Lambert, J.H., and Haimes, Y.Y., and Li, D., and Schooff, R.M., Tulsiani, V., (2001). "Identification, ranking, and management of risks in a major system acquisition", Reliability Engineering and system Safety, No. 72, pp. 315-325.
[7]. Ghosh, S and Jintanapakanont, J., (2004). ''Identifying and assessing the critical risk factors in an underground rail project in Thailand: a factor analysis approach"; International Journal of Project Management, Vol. 22, pp. 633–643.
[8]. Wagner, H., (2006). "Risk Evaluation and Control in Underground Construction"; International Symposium on Underground Excavation and Tunneling. 2-4 February, Bangkok: Thailand.
[9]. Herrenknecht, M. Bappler, K., (2006). "Mastering risks during mechanized excavation in urban centers with highly complex ground conditions".
[10]. Degn Eskesen, S., Tengborg, P., Kampmann, J., Holst Veicherts, T, (2004). "Guidelines for tunnelling risk management: International Tunnelling Association", Working Group No.2,
[11]. Beard, A. N., (2010). "Tunnel safety, risk assessment and decision-making", Tunnelling and Underground Space Technology, Vol. 25, pp. 91–94.
[12]. Isaksson, T., Stille, H., (2005). "Model for Estimation of Time and Cost for Tunnel Projects Based on Risk Evaluation", Rock Mechanic and Rock Engineering, Vol. 38, No. 5, pp. 373–398.
[13]. Pipattanapiwong, J., (2004). "Development of multiparty risk and uncertainty management process for an infrastructure project", Doctoral dissertation, Kochi University of Technology.
[14]. PMI (Project Management Institute); (2004). "a Guide to the Project Management Body of Knowledge (PMBOK Guide)"., Pennsylvania, Newtown Square.
[15]. BTS/ABI, (2003). "The Joint Code of Practice for Risk Management of Tunnel Works in the UK", London: BTS. (www.britishtunnelling.org).
[16]. Sepasad Engineering Company. (2008). "Execution Method, Machine Choice and TBM Technical Specifications of Tehran Subway Line 7". Tehran,Iran: Sepasad Engineering Company.
[17]. Sahel Consulting Engineers . (2008). "Engineering Geology Report of the Eastern-Western Part of Tehran Subway Line 7 Tunnel". Tehran: Sepasad Engineering Company.
[18]. Thuro, K., & Kasling, H. (2009). "Classification of the abrasiveness of soil and rock". Geomechanics and Tunnelling, No.2; 179-188.
[19]. Thuro, k., & Plinninger, R. (2003). "Hard rock tunnel boring, cutting, drilling and blasting: rock parameters for excavability". Tunneling roadmap for rock mechanics.
[20]. Sahel Consulting Engineers. (2011). "Engineering Report of the Eastern-Western Part of Tehran Subway Line 7" . Tehran, Iran: Sepasad Engineering Company.
[21]. Thewes, M., & Burger , W. (2004). "Clogging risks for TBM drives in clay". Tunnels & Tunneling International, 28-31.
[22]. Thewes, M., & Burger, W. (2005). "Clogging risks for TBM drives in clay – identification and mitigation of risks". Underground space use : Analysis of the past and lessons for the future (pp. Vol. 1-2). London: Taylor & Francis Group.
[23]. Finno, R., & Clough, G. (1985). "Evaluation of soil respone to EPB shield Tunnelling". Journal of Geotechnical Engineering, 111-155.
[24]. Feinendegen, M., Ziegler, M., Spagnoli, G., Fernandez – steeger, T., & Stanjek, H. (2010). "A new laboratory test to evaluate the problem of clogging in mechanical tunnel driving".,
[25]. Seli, T. M.–L.–W. (2008). "Description of the Supply of one Earth Pressure Balance TBM with Relevent Modular Back – up System"., Tehran, Iran: Sepasad Engineering Company.
[26]. Standing, J., Kjekstad, O., & Kastner, R. (2003). "Avoiding Damage Caused by Soil – Structure Interaction" : Lessons Learnt From Case Histories. London: Thomas Telford.
[27]. Engineers, J. S. (1996). "Japanese standard for shield tunnelling"., Japan: Committee of Tunnel Engineering.
[28]. Williamson, G., Traylor, M., & Higuchi, M. (1999). "Soil Conditioning for EPB Shield Tunneling on the South Bay Ocean Outfall"., In SME, Rapid Excavation and Tunneling Conference Proceedings (p. 29), SME.
[29]. Herrenknecht, M., & Frenzel, C. (2005). "Long Tunnels in Hard Rock – A Preliminary Review"., (pp. 343-349). Bauingenieur 80.