[1]. Hustrulid, W., and Kuchta, M. (1995). Open pit mine planning & design volume 1 – Fundamental. BALKEMA, ROTTERDAM.
[2]. Elahi, E. (2013). The Principles of Designing Open Pit Mines. Publication of Jihad Amikabir University, (In Persian).
[3]. Osanloo, M. (1995). Surface mining methods, planning and design. Ladan publishing Co.
[4]. Asad, M.W.A. (2007). Optimum cut- off grade policy for open pit mining operations through net present value algorithm considering metal price and cost escalation. Engineering Computations: International Journal for Computer- Aided Engineering and Software. 24(7): 723- 736.
[5]. Asad, M.W.A. (2005). Cut-off grade optimization algorithm with stockpiling option for open pit mining operations of two economic minerals. 19(3): 176-187.
[6]. Khodayari, A, and Jafarnejad, A. (2012). Cut-off Grade Optimization for Maximizing the Output Rate. Int J Min & Geo-Eng (IJMGE), 46(1): 51-56.
[7]. Biswas, P., Sinha, R.k., and Sen, Ph. (2023). A review of state-of-the-art techniques for the determination of the optimum cut-off grade of a metalliferous deposit with a bibliometric mapping in a surface mine planning context. Resources Policy, 83(103543): 1-9.
[8]. Taylor, H.K. (1972). General Background theory of cut-off grades. Institution of Mining and Metallurgy Transactions. A160–179.
[9]. Taylor, H.K. (1985). Cut-off grades-–some further reflections. Institution of Mining and Metallurgy TransactionsA204–216.
[10]. Lane, K.F. (1964). Choosing the optimum cut-off grade. Quarterly of the Colorado School of Mines. 59(4): 811–829.
[11]. Lane, K.F. (1988). The Economic Definition of Ore cut-off grades in Theory and Practice. London: Mining Journal Books
[12]. Cairns, R., and Shinkuma, T. (2003). The choice of the cut-off grade in mining. Resources Policy, 29 (3-4), 75-81.
[13]. Ahmadi, M.R., and Aghajani Bazzazi, A. (2019). Cut-off grades optimization in open pit mines using meta-heuristic algorithms. Resources Policy, 60: 72-82.
[14]. Minnitt, R. (2004). Cut-off grade determination for the maximum value of a small Wits-type gold mining operation. Journal of South African Institute of Mining and Metallurgy, 104: 277-284.
[15]. Khodaiari, A. A., and Jafarnejad, A. (2012). The effect of price changes on optimum cut-off grade of different open-pit mines. Journal of Mining and Environment. 3(1): 61-68.
[16]. Bascetin, A., and Nieto, A. (2007). Determination of optimal cut-off grade policy to optimize NPV using a new approach with optimization factor. Journal of South African Institute of Mining and Metallurgy, 107: 87-94.
[17]. Gholamnejad, J. (2008). Determination of the Optimum Cut-off Grade Considering Environmental Cost. J. Int. Environmental Application & Science. 3(3): 186-194.
[18]. Narrei, S., and Osanloo, M. (2015). Optimum cut-off grade’s calculation in open pit mines with regard to reducing the undesirable environmental impacts. International Journal of Mining, Reclamation and Environment. 29(3): 226–242.
[19]. Osanloo, M., Rashidinejad, F., and Rezai, F. (2008). Incorporating environmental issues into optimum cut-off grades modeling at porphyry copper deposits. Resources Policy, 33(4): 222-229.
[20]. Rahimi, E., and Ghasemzadeh, H. (2015). A new algorithm to determine optimum cut-off grades considering technical, economical environmental and social aspects. Resources Policy, 46: 51-63.
[21]. Wang, Q., Gu, X., and Chu, D. (2008). A dynamic optimization method for determining cut-off grades in underground mines. Gospodarka, Surowcami, Mineralnymi. 4(2): 133-142.
[22]. Khan, A., and Ali Asad, M.V. (2021). A mixed integer programming based cut-off grade model for open-pit mining of complex poly-metallic resources. Resources Policy, 72(102076): 1-9.
[23]. Shouguo, L., and Chang Y. (2012) .AN OPTIMUM ALGORITHM FOR CUT-OFF GRADE CALCULATION USING MULTISTAGE STOCHASTIC PROGRAMMING. Journal of Theoretical and Applied Information Technology. 45(1): 117-122.
[24]. Li, S., and Yang, C. (2012). An optimum algorithm for cut-off grade calculation using multistage stochastic programming. Journal of Theoretical & Applied Information Technology, 45.
[25]. Fathollahzadeh, K., Mardaneh, E., and Ali Asad, M.W. (2021). A mathematical model for open pit mine production scheduling with Grade Engineering and stockpiling. International Journal of Mining Science and Technology, 31 (4): 717-728.
[26]. Koushavand, B., Askari-Nasab, H., and Deutsch, C.V. (2014). A linear programming model for long-term mine planning in the presence of grade uncertainty and a stockpile. International Journal of Mining Science and Technology, 24(4): 451-459.
[27]. Jamshidi, M., and Osanloo, M. (2019). Reliability analysis of production schedule in multi-element deposits under grade-tonnage uncertainty with multi-destinations for the run of mine material. International Journal of Mining Science and Technology, 29(3): 483-489.
[28]. Ataei, M., and Osanloo, M. (2004). Using combination of genetic algorithm and grid search method to determine optimum cut-off grades of multiple metal deposits. Int. J. Surf. Mining, Reclam. Environ. 18: 60–78.
[29]. He, Y., Zhu, K., Gao, S., Liu, T., and Li, Y. (2009). Theory and method of genetic-neural optimizing cut-off grade and grade of crude ore. Expert Systems with Applications, 36: 7617-7623.
[30]. Ahmadi, M.R., and Shakoor Shahabi, R. (2018). Cut-off grade optimization in open pit mines using genetic algorithm. Resources Policy, 55: 184-191.
[31]. Mohammadi, S., Ataei, M., Kakaie, R., and Pourzaman, E. (2015). Comparison of golden section search method and imperialist competitive algorithm for optimization cut-off grade- case study: Mine No. 1 of Golgohar. Journal of Mining & Environment, 6(1): 63-71.
[32]. Rafiee, R., Ataei, M., and Azarfar, A. (2016). Determination of optimum cut-off grades to maximize net present value by using Imperialism Competitive Algorithm (ICA). Journal of Analytical and Numerical Methods in Mining Engineering, 6(11): 89-99, (In Persian).