<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE ArticleSet PUBLIC "-//NLM//DTD PubMed 2.7//EN" "https://dtd.nlm.nih.gov/ncbi/pubmed/in/PubMed.dtd">
<ArticleSet>
<Article>
<Journal>
				<PublisherName>University of Tehran</PublisherName>
				<JournalTitle>International Journal of Mining and Geo-Engineering</JournalTitle>
				<Issn>2345-6930</Issn>
				<Volume>50</Volume>
				<Issue>1</Issue>
				<PubDate PubStatus="epublish">
					<Year>2016</Year>
					<Month>06</Month>
					<Day>01</Day>
				</PubDate>
			</Journal>
<ArticleTitle>An imperialist competitive algorithm for solving the production scheduling problem in open pit mine</ArticleTitle>
<VernacularTitle></VernacularTitle>
			<FirstPage>131</FirstPage>
			<LastPage>143</LastPage>
			<ELocationID EIdType="pii">57862</ELocationID>
			
<ELocationID EIdType="doi">10.22059/ijmge.2016.57862</ELocationID>
			
			<Language>EN</Language>
<AuthorList>
<Author>
					<FirstName>Mojtaba</FirstName>
					<LastName>Mokhtarian Asl</LastName>
<Affiliation>Sahand University of Technology</Affiliation>

</Author>
<Author>
					<FirstName>Javad</FirstName>
					<LastName>Sattarvand</LastName>
<Affiliation>Sahand University of Technology</Affiliation>

</Author>
</AuthorList>
				<PublicationType>Journal Article</PublicationType>
			<History>
				<PubDate PubStatus="received">
					<Year>2016</Year>
					<Month>01</Month>
					<Day>05</Day>
				</PubDate>
			</History>
		<Abstract>Production scheduling (planning) of an open-pit mine is the procedure during which the rock blocks are assigned to different production periods in a way that the highest net present value of the project achieved subject to operational constraints. The paper introduces a new and computationally less expensive meta-heuristic technique known as imperialist competitive algorithm (ICA) for long-term production planning of open pit mines. The proposed algorithm modifies the original rules of the assimilation process. The ICA performance for different levels of the control factors has been studied and the results are presented. The result showed that ICA could be efficiently applied on mine production planning problem.</Abstract>
		<ObjectList>
			<Object Type="keyword">
			<Param Name="value">Imperialist competitive algorithm</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Integer linear programming</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">meta-heuristic methods</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Open pit mine production scheduling</Param>
			</Object>
		</ObjectList>
<ArchiveCopySource DocType="pdf">https://ijmge.ut.ac.ir/article_57862_0a624f525cf156567965efed8bf16b47.pdf</ArchiveCopySource>
</Article>
</ArticleSet>
